Makrolon® AL2447

Makrolon® AL2447 MVR (300 °C/1.2 kg) 19 cm³/10 min; Automotive lighting; low viscosity; UV stabilized; easy release; injection molding – melt temperature 280 – 320 °C; available in clear transparent colors and in various signal colors; headlamp lenses for automotive forward lighting

Category:
Description

Introduction

 

Makrolon® AL2447 | PC | Covestro Deutschland AG

MVR (300 °C/1.2 kg) 19 cm³/10 min; Automotive lighting; low viscosity; UV stabilized; easy release; injection molding – melt temperature 280 – 320 °C; available in clear transparent colors and in various signal colors; headlamp lenses for automotive forward lighting

Parameters

  Physical Test Method                Data      Unit
  Density   ISO 1183 1200 kg/m3
  Shrinkage rate flow 60*60*2mm 50MPa    ISO 294 0.65 %
  Shrinkage rate vertical 60*60*2mm 50MPa    ISO 294 0.70 %
  Shrinkage rate flow    ISO 2577 0.5-0.7 %
  Shrinkage rate vertical    ISO 2577 0.5-0.7 %
  Water absorption rate 23℃ Saturated in water    ISO 62 0.30 %
  Water absorption rate 23℃ 50RH Balance    ISO 62 0.12 %
  Melt Index 300 ℃ 1.2kg    ISO 1133 19 cm3/10min
  Melt Index 300 ℃ 1.2kg    ISO 1133 20 g/10min
  Bulk density granular    ISO 60 660 kg/m3
  Water Vapor Transmission Rate  23℃ 85RH 100μm    ISO 15106 15 g/m2/24hr
  Oxygen transmittance  100μm    ISO 2556 800 cm3(m2-24hr-bar)
  Oxygen transmittance  25.4μm    ISO 2556 3150 cm3(m2-24hr-bar)
  Nitrogen transmittance  100μm    ISO 2556 160 cm3(m2-24hr-bar)
  Nitrogen transmittance  25.4μm    ISO 2556 630 cm3(m2-24hr-bar)
  Carbon dioxide transmittance  100μm    ISO 2556 4800 cm3(m2-24hr-bar)
  Carbon dioxide transmittance  25.4μm    ISO 2556 18900      cm3(m2-24hr-bar)

Features

MVR (300 °C/1.2 kg) 19 cm³/10 min

light guides

optics and lenses

PC with highest transmission

low viscosity

easy release

Application

  • Car headlight cover
  • Applications in the automotive industry
  • Automotive lighting

auto parts

 

Parameters

Minimum Order Quantity: 25kg
Price: $1.6-$3.2
Packaging Details: 25kg/bag
Delivery Time: 3-5 working days to departure port
Payment Terms: TT/LC
Supply Ability: 1000MT/Month